Home & DIY / calculator
Concrete calculator
Combine concrete slabs, footings, columns and cylinders. Add allowance, calculate bags from mixed yield, and compare bagged versus ready-mix material costs.
Calculator
Calculator
Plan concrete for multiple sections.
Combine slabs, footings, rectangular columns and cylinders. Bags use stated mixed yield, never bag weight. Compare material costs using your supplier prices.
Your result
Enter details to see the result.
Complete the inputs and calculate to see the main result and its supporting breakdown.
Example
Worked example
Example inputs
- Dimensions unit
- m
- Depth unit
- cm
- Section name
- Section
- Concrete form
- Rectangular slab
- Length (m)
- 2
- Width (m)
- 1
- Depth (cm)
- 50
- Manufacturer yield preset
- Custom / label-stated mixed yield
- Package volume unit
- m³
- Mixed concrete yield per bag (m³)
- 0.012
- Bulk price volume unit
- m³
Calculation breakdown
Slab/footing = length × width × depth; rectangular column = length × width × height; cylinder = π × (diameter/2)² × height. Sum volumes and add allowance. Bags = ceil(required volume / mixed yield per bag). Ready-mix order = max(required volume, entered minimum); cost = order × unit price + entered delivery.
- Geometric concrete volume
- 1,000 L / 1 m³ / 35.3147 ft³ / 1.308 yd³
- Allowance added
- 0 L / 0 m³ / 0 ft³ / 0 yd³
- Purchasing concrete volume
- 1,000 L / 1 m³ / 35.3147 ft³ / 1.308 yd³
- Bag rounding surplus
- 8 L / 0.008 m³ / 0.2825 ft³ / 0.0105 yd³
Example result
Whole concrete bags
84 bags
How to interpret the result
The final volume includes the waste percentage you selected. It is a geometry estimate to discuss with a supplier, not a mix design or an exact order quantity.
Concrete sections
| Section | Volume |
|---|---|
| Section | 1,000 L / 1 m³ / 35.3147 ft³ / 1.308 yd³ |
How to use this calculator
- Choose dimension and depth units; add each supported concrete shape with its measured dimensions.
- Open purchasing settings to enter allowance and label-stated bag yield, or select an editable manufacturer preset.
- Optionally enter bag prices and ready-mix unit price, minimum order and delivery charge; calculate quantities and material costs.
How it works
Formula
Slab/footing = length × width × depth; rectangular column = length × width × height; cylinder = π × (diameter/2)² × height. Sum volumes and add allowance. Bags = ceil(required volume / mixed yield per bag). Ready-mix order = max(required volume, entered minimum); cost = order × unit price + entered delivery.
How many bags yield 1 m³ at 0.012 m³ per bag?
1/0.012 = 83.333… bags, rounded up to 84 whole bags before any additional allowance. Use the actual mixed yield printed by the manufacturer.
What this calculator does
Add each concrete shape to one project total. Choose a manufacturer’s approximate mixed yield or enter the yield on your bag label, then compare the quantities and costs of bagged concrete and ready mix.
Who this is useful for
DIYers and project planners estimating the geometric volume of a slab, footing, rectangular column, or cylindrical form.
Inputs you will need
Required or selected inputs
- Dimensions unit
- Depth unit
- Section name
- Concrete form
- Length (m)
- Width (m)
- Depth (cm)
- Manufacturer yield preset
- Package volume unit
- Bulk price volume unit
Optional inputs
- Additional material allowance (%) — Blank means 0%. Added to geometric quantity; compaction is not inferred.
- Mixed concrete yield per bag (m³)
- Price per package (your currency)
- Price per bulk unit (your currency)
- Minimum ready-mix order (m³)
- Ready-mix delivery charge (your currency)
What to check before using the result
Floor area alone cannot determine concrete quantity: thickness supplies the third dimension. Measure depth in several places because an uneven base can increase volume beyond the nominal slab. The allowance adds to geometric volume; it does not model compaction, reinforcement, mix strength or the supplier's minimum delivery. Bag yield is mixed concrete volume, not the dry bag's weight.
Assumptions
- Geometric shapes are solid. Yield refers to mixed concrete volume, not dry bag weight. The initial 0.012 m³ yield is an illustrative user-entered example; replace it with your product label.
Limitations
- Material planning only: mix selection, structural design, reinforcement and compliance are not evaluated. Costs include only entered material and delivery amounts, excluding labor and unentered fees.
Useful next steps
Plan gravel and sand separately below paving with Paver base calculator.
References
QUIKRETE Concrete Mix: manufacturer mixed-yield data — Concrete Mix data sheet states approximate yields of 0.30 ft³ for a 40 lb bag, 0.45 ft³ for 60 lb and 0.60 ft³ for 80 lb. Editable presets use the stated cubic-foot values; they do not infer yield from weight.
See how HandyChest handles units, validation, rounding, and testing, or Report a problem with this calculator.
Good to know
Frequently asked questions
Can bag weight determine concrete yield?
No. Products and mixes differ. The QUIKRETE presets use explicitly stated approximate mixed volumes from the Concrete Mix data sheet; you can edit the yield for your product.